INSTRUCTION MANUAL
Before starting to open the moulds kit pallets,
take a look at the detailed manual.
It simplifies the first operation for dividing
the kits' parts.
KITS' PALLETS
The numbers and the dimension of pallets
depend on the length of the boat,
and on the kind of wood chosen.
IroN STRUCTURE
not included in the kit supply
The shipyard will receive the iron structure scheme documentation, before the delivery of the kit, and all the parts can be mounted in advance.
If the Shipyard has some old tubular, can communicate to our Technical department the relative dimensions, and we can adjust our design with your measures, without buying the new ones.
division of the kit
Follow the instruction manual to divide the items of the kit, using the mark present in any single parts.
GLUEING THE PIECES
When necessary, Joint the parts (stations - longitudinal - .transversal) like showed, with
abundant glue.
start
All the kits must be mounted starting
from S1 ( Station 1 ).
Follow the instruction manual.
BattenS & PLANKING
After the structure, the mounting continue,
with the battens, and after with the planking.
End
Mould Finished
lamination
All the Kits are designed and realized for the
infusion & pre-preg lamination technologies,
with particular care for any details of the structure & planking, able to be used
up to 80°C.
Project
Mould Design & Delivery
Shipment
Ship Building
[ time ]
10 / 30 Business Days
[ time ]
[ time ]